GATE & PSU Chemical Engineering (Regular Batch – 15th July)
10:30 AM – 01:30 PM Mechanical Operations (in Continuation)
02:00 PM – 05:00 PM Plant Design and Economics (in Continuation)
GATE & PSU Chemical Engineering (old Regular Batch)
10:30 AM – 01:30 PM Mechanical Operations
02:00 PM – 05:00 PM Plant Design and Economics
GATE & PSU Chemical Engineering (Weekend Batch – 1)
10:30 AM – 01:30 PM Mechanical Operations
02:00 PM – 05:00 PM Plant Design and Economics
GATE & PSU Chemical Engineering (Weekend Batch – 2)
10:30 AM – 01:30 PM Mechanical Operations
02:00 PM – 05:00 PM Plant Design and Economics
GATE – PSU – IES Mechanical Engineering Batch
10:30 AM – 01:30 PM Industrial
02:00 PM – 05:00 PM Engineering Thermodynamics
GATE – PSU – IES Electronics and Communication Engineering Batch
10:30 AM – 01:30 PM Signal & System
02:00 PM – 05:00 PM Signal & System
GATE -PSU – IES Electrical Engineering Batch
10:30 AM – 01:30 PM Signal & System
02:00 PM – 05:00 PM Signal & System
GATE – PSU- IES Civil Engineering
11.00 AM onwards Str. Analysis